RECOMMENDED PROCEDURE FOR INSTALLATION:
- Turn off water.
- Remove nuts and washers A and B from connector.
- Apply solvent weld to inside of connector and outside of Schedule 40 stub-out pipe. Join with a twisting motion
- Put nut A and washer B on wall tube (or floor tube).
- Insert in connector. Tighten by hand. Run water to test for leaks.
NOTE: These parts are designed for a hand-tight installation. Pipe thread compound is not required.