Couplings-Extension, 45, 90 — Installation Instructions

PP28081

Instructions:
  1. Turn off water supply leading to work area.
  2. Place faucet coupling nut on supply tube as shown in illustration.
  3. Tighten nut to faucet shank.
  4. Run water to test for leaks