Transition Fittings — Installation Instructions

PP32-10BR

Straight Transition Fitting Inlet 1/2" nom. CPVC Outlet 3/8" O.D. tube Brass

Pp32-10br
Instructions:
  1. Turn off water supply leading to work area.
  2. Be sure CPVC tube is squarely cut.
  3. Clean tube of burrs and foreign particles.
  4. Apply solvent to CPVC tube.
  5. Slide CPVC end of fitting or valve on to tube.
  6. Connect other end of fitting to the appropriate copper tube, nipple or iron pipe fitting.