Valves — Installation Instructions

PP32-1PC

Angle Transition Valve Inlet 1/2" nom. CPVC Outlet 3/8" O.D. tube

Pp32-1pc
Instructions:
  1. Turn off water supply leading to work area.
  2. Be sure CPVC tube is squarely cut.
  3. Clean tube of burrs and foreign particles.
  4. Apply solvent to CPVC tube.
  5. Slide CPVC end of valve on to tube.
  6. Place compression nut and sleeve on supply tube. Attach to valve.