Couplings-Extension, 45, 90 — Installation Instructions

PP55-6W

1-1/2" 3-Way Tee

Pp55-6w
The 3-Way Tee is used to join three tubes at an angle forming a "T". The nuts tighten with simple hand pressure.
RECOMMENDED PROCEDURE FOR INSTALLATION:
  1. Turn off water.
  2. Remove nuts and washers A, B, C, D, E and F.
  3. Slip a nut and washer on each of the three tubes to be connected as illustrated.
  4. Position tee and tighten nuts. Run water to test for leaks.
NOTE: These parts are designed for a hand-tight installation. Pipe thread compound is not required.