PP18CP
1-1/2" Center Outlet Tee & Tailpiece 22 gauge

Recommended procedure for installation:
- Turn off water at the tap.
- Remove old tee and tailpiece.
- Remove nuts A and D and washers B and C from new tee and tailpiece.
- Put nuts and washers on waste drain tubes leading to tee as illustrated.
- Place nut and washer from J Bend onto tee.
- Position tee. Tighten nuts securely. Run water to test for leaks.
For complete center outlet waste drain installation:
- Purchase 2 waste drain tubes.
- Measure the distance between W and X and between Y and Z and cut drain tubes to length with a hacksaw.
- Remove nuts and washers E, F, G and H from the new waste drain tubes and put on strainer tailpieces, as illustrated.
- Assemble tee and tailpiece according to the instructions above.
- Position entire center outlet waste and tighten nuts securely. Run water to test for leaks.
Installation hint:
- Put Telflon® tape on the drain threads before attaching nuts. This will help provide a better seal against leaks.
- Use a scrap of cloth to protect the chrome finish on the nuts when you
tighten with a wrench
Hacksaw, pipe or spud wrench, thread sealant tape