Valves — Installation Instructions

PP20127

3 Way Valve Inlet 1/2" F.I.P.Outlet 3/8" O.D. x 3/8" O.D.

Pp2901
Instructions:
  1. Turn off water supply leading to work area.
  2. Open faucet to remove water existing in line.
  3. Remove old valve.
  4. Slide flange over copper stub-out.
  5. Place large compression nut and sleeve onto copper stub-out.
  6. Place remaining two compression nuts and sleeves on supply tube leading to faucet and supply tube leading to dishwasher or sink.
  7. Line up shut-off valve with stub-out and supply tubes. Attach all nuts.
  8. Tighten all nuts securely.
  9. Turn water on slowly to test for leaks.
Iphone8_app_screen

KEENEY CATALOG APP

  • Easily look up and find products
  • Create work lists of favorite products
  • View PDF catalogs and literature
  • Connect with Customer Service