63CW
Bath Drain Foot Lok Stop White W/Condensate Tube
Warning: Parts Engineered to be hand tight!
Instructions:
- Connect waste shoe, tee,overflow tube and screw "Foot Lok" assembly into shoe in normal manner.
Note: Properly assembled, overflow tube should be vertical and at a right angle to bathtub.
Note: When drain is properly installed washer will be between waste shoe and tub.
- Assemble sponge rubber gasket between tub and overflow flange and insert tub tack into slots on both sides of overflow to maintain location of overflow and gasket for future assembly of face plate.
- Align faceplate with threaded holes in overflow and insert to complete installation