630PVCTP
Bath Drain Schedule 40 Foot Lok Stop, Test Plug
Installation
- Use Solvent weld cement to connect overflow elbow, waste elbow and tee to overflow pipe and waste pipe. Per Diagram.
Note: Properly assembled, overflow tube show be vertical and at a right angle to bathtub.
- Attach sponge rubber gasket between tub and overflow elbow and insert tub tacks into slots on both sides of overflow to maintain location of overflow and gasket for future assembly of face plate.
- Screw in stopped mechanism.(Lift `N Turn, Roller Ball or Foot Lok Stop) into washer and waste shoe.
Note: When drain is properly installed washer will be between waste shoe and tub.
- Align faceplate with threaded holes in overflow and insert screws to complete installation